Capital Water Distribution Replacement & Rehabilitation
The Town of Hanover Water Distribution Improvement Project will begin April 28, 2025. The Town of Hanover will be replacing several water main distribution lines over the next couple of years. The project was awarded to L &M Contractors. Project Areas 1 and 4 will be constructed in 2025 and Project area 3 and a portion of Project Area 2 (Rope Ferry) will be constructed in 2026. Areas are shown in the map below. The Town is utilizing Wright-Pierce as the Engineers of record. The project will be performed over two construction seasons.
Letters have gone out to residents in the affected project areas to let them know who the successful bidder is and the tentative construction schedule so that residents will know when to expect construction on their street.
Please visit this site periodically for updates and sign up for the Project updates on the News Flash.
If you have any questions or require any additional information or concerns, please contact Christina.Hall@hanovernh.org. Thank you.
INFORMATIONAL UPDATES, Background & Survey Information
- Currier Place UPDATE
- Roadway Closure and Driveway Impacts
- LM Roadway Impacts
- LM Roadway Closure Area 4 250918
- Area 4 Schedule 250911
- L&M Roadway Closure
- Paving Notice River Ridge, Weatherby and Read
- Water Shutdown Notice Ledyard Lane
- LM Hovey Lane Road Closure
- LM Water Shutdown Notice 250724
- LM Services Area1 Phase 1 Paving Notice
- Pavement Reclaiming July 14 and 15
- LM Roadway Construction Notice
- LM Sargent Street Services Notice 6.25.2025
- Letter To Residents Project Area 4 meeting 6.18.2025
- Area 4 Schedule.pdf
- LM Services Notice Downing Road 250620
- LM Sargent Street Road Closure Notice 250612
- Area 1 Schedule Update 250609
- LM Traffic Delay Notice 250609.pdf
- LM Traffic Delay Notice 250527
- Area 1 Schedule Update 250521.pdf
- Water Project Notice of Water Shut Down for May 15 2025.pdf
- Water Distribution Project Informational Meeting May 6, 2025 (PDF)
- Town of Hanover EPA Brass Study.docx
- Water Testing in the Water Distribution Project Area.docx
- Hanover_Lead bullet points.docx
- Notifying Scheule Brass Service Line AppointmentApril 2025 - Copy.docx
- NewsFlash for Water Distribution Project -Construction beginning.docx
- L & M Water Shutdown Notice 250502 (PDF)
- Letter to Residents April 2025.pdf
- Area 1 Schedule combined.pdf
- Hanover-Water Distribution Imp-Plans-IFB compressed.pdf
- Exhibit 1_ProjectAreas_1thru6.pdf
- Area 4 Schedule
- Letter to Residents Project Area 1 7-3-24 (DOCX)
- Letter to Residents Project Area 2 and 3 7-3-24 (DOCX)
- ProjectAreas_Rev1.pdf
- Survey Notification Letter Project Area 1-6.docx
- Survey Notification Letter Project Area 7-11.docx
- Water Distribution Projects 1-6-Residents Survey letter 2023.docx
- Water Distribution Projects 7-11-Residents Survey letter 2023.docx